Asbestos Removal Projects

Toohey Rd, Salisbury

Following a rigorous tendering process we were awarded the asbestos removal for the project on Toohey Rd, Salisbury. Irwin Asbestos Management Pty Ltd’s role in this 2018 industrial renovation consisted of removal, disposal & decontamination of a 7500m2 super six asbestos roof, 900m2 asbestos vinyl tiles, bathroom strips and removal/disposal of all asbestos fire doors throughout tenancies.

The project was bolstered with 6 scissor lifts, 2 forklifts and 1 boom lift, cranes were also used at various stages of the project. The site presented some logistical challenges, including working around tenanted areas of the facility and a 24/7 access gym. Ten staff all with appropriated tickets, licenses, insurances and experience ensured the project ran safely, on time and decontamination was to the HIGHEST industry standard.

An independent NATA accredited hygiene firm were engaged to run air monitoring during asbestos removal works, sign off on migration barriers built at certain stages of job and to execute visual clearance inspections at completions of each stage of the project.

Irwin Asbestos Management Pty Ltd were able to safely complete all works with no incidents reports and with no elevated air monitoring levels, all while working closely with the principal contractor and all trades on site to ensure all working personnel were safe at all times and to ensure no trades were held up impacting the schedule of the project.

Asbestos Roof Removal Project
Plant Used - 9
Scissors, Forks, Cranes & Knuckle Booms
3 Months
Project Duration
900m2
Additional Removal
6500m2
Asbestos Roof
Medical Centre – North Brisbane

A Medical Centre in North Brisbane underwent a renovation in 2017, part of this project was to upgrade the front facade on Gympie Rd. Irwin Asbestos Management Pty Ltd were awarded the removal works in the upgrade of the front facade, consisting of compressed asbestos sheeting. Three stories of scaffold was installed and the team erected a full migration barrier separating the work area from the busy foot path and main road.

A Medical Centre in North Brisbane underwent a renovation in 2017, part of this project was to upgrade the front facade on Gympie Rd. Irwin Asbestos Management Pty Ltd were awarded the removal works in the upgrade of the front facade, consisting of compressed asbestos sheeting. Three stories of scaffold was installed and the team erected a full migration barrier separating the work area from the busy foot path and main road.

All works were done after-hours. Six staff all with appropriated tickets, licenses, insurances and experience ensured the project ran safely, on time and decontamination was to the HIGHEST industry standard.

An independent NATA accredited hygiene firm were engaged to run air monitoring during works and undertake the visual clearance inspection on completion.

Irwin Asbestos Management Pty Ltd were able to safely complete all works with no incidents reports and with no elevated air monitoring levels.

Asbestos Roof Removal Project
ZERO
Incidents
After Hours
Works
4 Stories
of Scaffold
Zero Elevation
Air Monitoring Levels
Highrise – Adelaide St, Brisbane

Our relationship with this ongoing building revamp began towards the end of 2016 when we were awarded the job for a small lift lobby fit out which included the removal of asbestos vinyl tiles. This project was small but this in no way changed our standards of safe removal/disposal and integral decontaminations.

Since then we have continued to be a part of the dynamic team revamping this building on Adelaide and it is a project that we are extremely proud to be a part of. To date we have removed over 4000m2 of asbestos vinyl tiles over 13 levels.

Our staff all with appropriated tickets, licenses, insurances and experience ensured each project is run safely, on time and decontamination was to the HIGHEST industry standard. Our aim is to ensure we can undertake our works with minimal to no disruption for the rest of the office spaces around so all work here is run out of hours.

An independent NATA accredited hygiene firm were engaged to run air monitoring during asbestos removal works, sign off on migration barriers built at certain stages of job and to undertake visual clearance inspections at completions of each stage of the project.

Asbestos Roof Removal Project
18,000m2
Asbestos Removed
13 Level
Highrise
After Hours
Works
Zero Elevation
Air Monitoring Levels
Water Reservoirs - Bunya & Narangba

Two Unity Water reservoirs underwent complete roof renovations in 2019 and 2020. The scope consisted for replacement of all roof sheeting and the entire roof structure. Irwin Asbestos Management Pty Ltd were awarded the asbestos roof removal works for both reservoirs on completion of tenders.

All works were completed by a team of ten staff all with appropriated tickets, licenses, insurances and experience ensured the project ran safely, on time and to a high standard.

An independent NATA accredited hygiene firm were engaged to run air monitoring during works and undertake the visual clearance inspection on completion. Irwin Asbestos Management Pty Ltd were able to safely complete another project with no incidents reports and with no elevated air monitoring levels. 

Reservoir Asbestos Removal Image
4,500m2
Combined
High Risk
Works
Zero
Incidents
Preffered
Contractor For Both Projects

Some Of Our Happy Clients

Ready to put safety first?

Asbestos Removal Quote